顶部语言选择内页

Time of issue:2019-09-11 00:00:00

CN / RU ss

1

1

/
/
/
1 million square wellhead integrated device

Product center

Number of views:
1010

1 million square wellhead integrated device

Retail price
0.0
$
Market price
0.0
$
Number of views:
1010
Product serial number
Quantity
-
+
Stock:
0
1
Detailed introduction
Parameters

Integrated skid mounted device performance description

■ Single well integrated skid-mounted device is a chemical filling system, water jacket heating furnace, separator, natural gas metering device, pigging device, orifice plate throttling device, transmitter in single well natural gas production. Fuel gas pressure regulation, corrosion monitoring system and integrated equipment integrating valves, pipelines and instruments. Skid-mounted equipment meets safety production requirements, is easy to operate, overhaul and maintenance management, and is neatly installed, beautiful, and easy to transport, hoist and meter readings.

■ The gas from the wellhead is heated by the heating furnace. After two stages of pressure regulation, it enters the separator to separate the light hydrocarbons and natural gas from the wellhead, and meter the natural gas and light hydrocarbons separately. Finally, go to the outbound valve block through the ball.

■ The gas field fuel gas pipe network provides fuel through the pressure regulating metering water heating furnace, and at the same time provides the pneumatic gas source of the pneumatic liquid level controller.

■ Corrosion inhibitor filling part, the pump outlet pressure is up to 70MPa, two ways to the wellhead, and the other is to the pipeline behind the orifice throttling device.

Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table

通用底部1

Time of issue:2019-09-11 00:00:00

Contact us

First production base 028-8888888 No.166, Jinfu Road, Jinniu District, Chengdu

Second production base 028-8888888 Gangtong North Third Road, North District, Modern Industrial Port, Pixian County, Chengdu

Third production base 028-8888888 Chengdu Tianfu New District

Fourth production base 028-8888888 Economic Development Park of Deyang High-tech Zone, Sichuan Province, Chengdu

img

通用底部

Time of issue:2019-09-11 00:00:00

Copyright © Sichuan Jinxing Clean Energy Equipment Co., Ltd. All Rights Reserved. Powered by 300.cn 蜀ICP备13008674号-1