-
- Hydrogen Energy Equipment
- Gas compressor
- CNG filling station complete equipment
- Complete Equipment of LNG Filling Station
- Natural gas purification skid-mounted equipment
- Natural gas deep processing equipment
- EPC Services
- Equipment intelligent operation and maintenance supervision cloud platform
- Product accessories
undefined
Statistics on the number of times the solenoid valve is used: users can understand the use of solenoid valves, which is convenient for users to prepare solenoid valve accessories and daily maintenance.
Solution of CNG Standard Station Substation System
Pressure regulating and metering system: pressure regulating and metering device.
500000 square wellhead integrated device
Single-well integrated skid-mounted device is an integrated device that integrates chemical filling system, water jacket heater, separator, natural gas metering device, pigging firing device, orifice plate throttling device, transmitter, fuel gas pressure regulation, corrosion monitoring system and supporting valves, pipelines and instruments in single-well natural gas production.
1 million square wellhead integrated device
Single-well integrated skid-mounted device is an integrated device that integrates chemical filling system, water jacket heater, separator, natural gas metering device, pigging firing device, orifice plate throttling device, transmitter, fuel gas pressure regulation, corrosion monitoring system and supporting valves, pipelines and instruments in single-well natural gas production.
300000 square wellhead integrated device
Single-well integrated skid-mounted device is an integrated device that integrates chemical filling system, water jacket heater, separator, natural gas metering device, pigging firing device, orifice plate throttling device, transmitter, fuel gas pressure regulation, corrosion monitoring system and supporting valves, pipelines and instruments in single-well natural gas production.
200000 square wellhead integrated device
Single-well integrated skid-mounted device is an integrated device that integrates chemical filling system, water jacket heater, separator, natural gas metering device, pigging firing device, orifice plate throttling device, transmitter, fuel gas pressure regulation, corrosion monitoring system and supporting valves, pipelines and instruments in single-well natural gas production.
24-hour service hotline
First production base028-87514589 /87509320No. 670, Gangtong North 3rd Road, North District of Modern Industrial Port, Pixian County, Chengdu City
Second production base028-36999680No. 12, Section 2, Tengfei Avenue, Shigao Economic Development Zone, Tianfu New District, Chengdu
Third production base0838-2602162Chengdu City, Deyang City, Sichuan Province High-tech Zone Economic Development Park
Fourth production base0838-2602162Longnu Lake Tourist Area, Yankou Town, Wusheng County, Guang'an City, Sichuan Province
Sweep to identify concerns:
Enter the Jinxing Group
More wonderful waiting for you!




